N.A. status and TP schemes

If this site could teach one two-letter concept to every Dholera buyer, it would be this one. The gap between an N.A. plot and an agricultural survey number is not a discount; it is a different legal species.
What N.A. actually is
Indian land defaults to agricultural use; converting it to residential, commercial or industrial use requires a government order under the revenue code, with premiums paid and conditions attached. That order is what "N.A." abbreviates. It attaches to the parcel and appears in the record. "N.A. permission applied for" is a hope. "N.A. in principle" is a hope in a suit. The order is the thing.
The TP scheme shortcut, and why it matters here
Gujarat's town planning law treats land inside a sanctioned TP scheme as deemed N.A. for the scheme's planned uses, because the scheme itself is the state redesigning the land. Dholera's six schemes are draft-sanctioned, with TP1 and TP2 forming the 153 sq km Phase 1. Practical consequence: a final plot in a sanctioned Dholera TP scheme carries the cleanest buildability story available in this market, one reason our shortlists lean hard toward them. (One verification note: confirm the specific scheme's sanction status and your plot's final-plot allotment, since draft and final sanction stages differ in detail; we check the current position for every shortlisted plot rather than assuming.)
The three costumes agricultural land wears
The render costume: gates and boulevards drawn over farmland, with N.A. nowhere in the paperwork. The proposal costume: "inside proposed TP7" or similar; proposals are not sanctions, and Dholera's sanctioned schemes are numbered one to six. The someday costume: "N.A. guaranteed within a year", which prices a government decision as if the seller controlled it. In all three cases the honest price is agricultural-speculation price, and the honest disclosure is the costume's absence.
What to demand in writing
Either the N.A. order number for the parcel, or the TP scheme name, sanction reference and your final plot number. Then verify: the record on AnyROR should be consistent, and the layout should be the sanctioned one. Ten minutes of demand-and-check, and this entire trap category closes. It is also step six of our eleven-step process.